MBTA Gloucester Drawbridge Replacement

Project Details

Owner

MBTA

SERVICES

PROJECT CONTROLS

PROJECT DESCRIPTION

Originally built in 1911, the Gloucester drawbridge supports the Newbury/Rockport MBTA Commuter Rail line over the Annisquam River. The MBTA suspended service across the bridge in 2020 due to site conditions and decided to replace the bridge. The existing single two-track moveable draw is being replaced with two new single-track moveable drawers, with new piers and abutments. A new signal control tower is being constructed with mechanical and electrical systems integrated with the railroad signal system. City Point Partners provides independent cost estimates during construction phase services. 